Carrier profile · USDOT 1373378 · Updated Jun 13, 2026

CRITICAL PATH CONSTRUCTION MANAGEMENT INC

1 power unitsFAYETTEVILLE, AR50/100
AUTHORITY STATUS UNKNOWN
Verified linksFMCSA SAFER
Observed fleet · trailing 24 mo daily
1Power units
Self-reported · MCS-150
Trailers seen
None observed · 24 mo
Avg age (yr)
Not yet decoded
USDOT registration21 yr registered
Authority not on file
Insurance (BIPD) unknown
No filing on record
Vehicle OOS · 24-mo
No inspections · 24 mo
Crashes · fatal
No crash record
Vektor intelligence · beyond the federal recordProprietary signals computed from VIN-decoded inspections & daily FMCSA snapshots
Fleet typeIdentity

Owner-operator

1 power units. Brokers price each fleet type apart.

Fleet age vs peersDecoding

Not yet decoded

Identity stabilityStable

21 yr unchanged

Same registration since 2005 — no chameleon / reincarnation signal.

Loading full carrier record…
Verification summaryAuthority, insurance, safety and identity facts for CRITICAL PATH CONSTRUCTION MANAGEMENT INC.

CRITICAL PATH CONSTRUCTION MANAGEMENT INC (USDOT 1373378) is unrated by Vektor because the carrier's FMCSA record does not contain enough evidence for a safety score as of Jun 13, 2026.

The carrier has an unknown current for-hire authority status because no FMCSA L&I authority row is available as of Jun 13, 2026.

It has an unknown current BIPD insurance status because no FMCSA L&I active-filing snapshot is available as of Jun 13, 2026.

The carrier received 0 roadside inspections in the last 24 months — 0 vehicle-level and 0 driver-level, according to FMCSA roadside-inspection data refreshed Jun 13, 2026.

It reports 1 power unit and 4 drivers in its most recent MCS-150 filing dated May 17, 2005.

It has no FMCSA-assigned safety rating in the federal record refreshed Jun 13, 2026.

02

Frequently asked

What is CRITICAL PATH CONSTRUCTION MANAGEMENT INC's USDOT number?

CRITICAL PATH CONSTRUCTION MANAGEMENT INC's USDOT number is 1373378.

Is CRITICAL PATH CONSTRUCTION MANAGEMENT INC authorized to operate?

As of 2026-06-13, CRITICAL PATH CONSTRUCTION MANAGEMENT INC is inactive in the FMCSA register.

How big is CRITICAL PATH CONSTRUCTION MANAGEMENT INC's fleet?

CRITICAL PATH CONSTRUCTION MANAGEMENT INC operates 1 power unit and 4 drivers per its most recent MCS-150 filing.

Where is CRITICAL PATH CONSTRUCTION MANAGEMENT INC based?

CRITICAL PATH CONSTRUCTION MANAGEMENT INC is based in FAYETTEVILLE, AR.

03

Similar carriers

Peer comparison temporarily unavailable

We could not retrieve a reliable peer set for this profile right now.